Case Studies

Case Study – Automotive Industry

The Issue

A broken drive unit meant the customer was facing a downturn in critical production timescales unless fixed within 24 hours.

The Solution

The unit was collected from Swindon, dismantled, the bearings and seals replaced, reassembled, re-welded and delivered back to site within the critical timescale.

“Ind-Tech’s speedy response meant that critical production timescales were met despite the drive unit failure.” C.N. Engineer

Leave a Comment